Cold prefabricated warehouse 420 m² in western Ukraine
Turnkey installation in 10-12 days – from a supervising installer to a full crew
Task
A client in western Ukraine needed a 420 m² warehouse facility within a tight timeframe and on a limited budget. The initially agreed "supervision-only" format shifted to a full turnkey implementation after the client's plans changed – and the team responded swiftly.





Key Technical Solutions
- Installation speed: erecting the structure from start to handover took 10–12 days thanks to a refined technology and a well-coordinated crew.
- Format flexibility: the project started as a “supervised installation,” but after the client changed their plans, the company sent its own installation crew and fully covered the need.
- Foundation and installation: the structure was installed without a permanent foundation — on an existing solid surface, which reduced the preparation phase to a minimum.
- Translucent roof: T35 corrugated sheeting provides natural daytime lighting and reduces electricity costs.

Project Description
For a client in western Ukraine, a cold quick-assembly warehouse with an area of 420 m² was built, featuring an aluminum frame and T35 corrugated steel sheet cladding. The structure was erected on an existing surface without pouring a foundation — the technology allows installation on soil, slabs, gravel, concrete, and asphalt.

A distinctive feature of the project was a change in format during the preparation phase. Initially, the client planned to construct the warehouse independently under a “supervised installation” arrangement; however, after revising their plans, the company dispatched its own crew and carried out the full scope of work. Installation was completed in 10–12 days.
The structure requires no commissioning or permitting documentation. The modular design allows for area expansion, disassembly, and relocation to a new site without any loss of materials.

Technical Specifications:
- Area: 420 m² | Length: 30 m | Width: 14 m
- Height: 6,500 mm / at ridge: 9,478 mm
- Roof pitch: 22° | Material: T35 corrugated steel sheet
- Wind load: ≤ 28 m/s | Snow load: 75 kg/m²
- Installation time: 10–12 days
Result
- The client received a fully completed warehouse facility on schedule and within budget, despite the change in the implementation format during the preparation phase.
- The project confirmed the adaptability of both the technology and the team: the transition from advisory support to full installation was carried out without delays or additional approvals.